Building Site: The site is being final graded with work on the infiltration pond being completed later this month. The irrigation system is being installed around the building and final seeding and sodding is ongoing. Some of the final plantings will be installed next month. Also in October the sidewalks and remainder of the first lifts of asphalt paving will be installed.
Building Exterior: The exterior enclosure of the building is in full swing. Roofing has begun over the two gymnasium spaces along with the installation of windows. The exterior precast is being caulked and will be washed by the end of fall.
Building Interior: Interior slabs are being placed in the basement working from the east to west. The first and second floor slabs between the two gymnasiums has been placed. Mechanical equipment has been set in the mechanical room on second floor and later this month the slab in the lobby and classroom spaces will be poured.
In October painting of the gymnasium ceilings will begin with ceiling mounted athletic equipment arriving later in the month.
First Floor Slab Being Finished |
Roof Installation Being Installed |
Lobby Atrium Steel |
Interior Of East Gymnasium |
Preparing for Basement Slab |
First Floor Block Walls |
Placing Basement Slab |
View Looking At Front Entry |
No comments:
Post a Comment